From 2006 through 2006, Hunger Maschinen GmbH (through Hans Künz, Austria) furnished one of the largest European hydroelectric power plant projects by providing 7 hydraulic power packs for 7 power plant dams consisting of 3 sector gates with flap gate and 4 without flap gate. Additionally, 14 control blocks for the sector cylinders as well as 6 control blocks for the clamshell cylinders were provided by our sister company Walter Hunger GmbH & Co. KG.
The 100 year old river power station was replaced with a more modern and efficient equipment. The new construction enabled the average annual capacity to be tripled to 600 GWh.